The Consortium and its members execute the following tasks in the project management workflow. 


Design Phase:

  1. Site Assessment: Evaluating potential locations for solar power plants based on factors, such as solar irradiance, shading, and land availability.
  2. Energy Yield Estimation: Calculating the expected energy output of the solar power plant based on site-specific data.
  3. System Sizing: Determining the appropriate capacity of the solar power plant to meet energy production goals.
  4. Technology Selection: Choosing solar panel types, inverters, and mounting structures that align with project requirements and budget.
  5. Engineering and Electrical Design: Creating detailed engineering plans for solar array layout and electrical connections.
  6. Environmental and Regulatory Compliance: Ensuring compliance with environmental regulations and obtaining the necessary permits and approvals.
  7. Financial Modeling: Developing financial models to estimate project costs, returns on investment, and ROI periods.
  8. Grid Integration: Planning for the connection of the solar power plant to the electrical grid and coordinating with utility companies.

Manufacturing Phase:

  1. Solar Panel Production:
  2. Manufacturing solar panels and assembling them into modules.
  3. Inverter Manufacturing: Producing inverters that convert DC electricity from the solar panels into usable AC electricity.
  4. Mounting and Racking Systems: Manufacturing mounting structures and racking systems to support the installation of solar panels.
  5. Regulatory Compliance: Complying with regulations to reduce environmental impact associated with the manufacturing process.
  6. Quality Control: Implementing rigorous quality control measures to ensure the reliability and performance of manufactured components.

Installation Phase:

  1. Site Preparation: Clearing and grading the site as well as installing any necessary foundations or support structures.
  2. Solar Panel Installation: Mounting and connecting solar panels on the support structures according to the engineering plans.
  3. Inverter and Electrical Installation: Installing inverters, wiring, and electrical components for the solar power system.
  4. Grid Connection: Connecting the solar power plant to the grid and ensuring proper synchronization and safety measures.
  5. Commissioning: Testing and verifying the performance of the entire solar power plant to meet design specifications.
  6. Operations and Maintenance Planning: Developing plans for ongoing maintenance and monitoring of the solar power plant.
  7. Training: Providing training to personnel operating and maintaining the solar power plant.
  8. Performance Monitoring: Implementing systems to continuously monitor and optimize the performance of the solar power plant.
  9. Documentation and Reporting: Preparing documentation and reports required for compliance, performance tracking, and regulatory reporting.
  10. Safety Measures: Implementing safety protocols to protect workers during installation and maintenance. 